About Us
Service Support
Pre-sales service
(After the equipment is installed, it is carried out at the user's place)
In order to facilitate our service personnel to debug the equipment you purchased, so that you can put it into production as soon as possible. In particular, please pay attention to the following preparations before the equipment you purchased is in place. Then inform our company's technical service department to debug for you.
1. equipment layout
Please arrange the equipment in turn according to the process flow.
1. If the equipment is placed against the wall, a gap of not less than 0.8 meters should be reserved to facilitate maintenance.
2, the gap between the equipment should prevent the processing of the profile interference.
2. Power Requirements
1. Input the total power reference configuration device, which is determined by the total power consumption.
2. Equipment input voltage 380V two. The equipment input voltage is 380V and adopts three-phase four-wire system.
3. All equipment is equipped with grounding protection devices, so in order to ensure safety, please take grounding protection measures for the equipment in strict accordance with the specifications, or take other protection measures according to the requirements of the enterprise.
4. Each equipment shall be equipped with a separate switchboard.
3. air supply requirements
1, air compressor selection: the air compressor exhaust volume should not be less than the sum of the air consumption of all equipment, and leave more than 1/4 of the margin.
2. Air filters must be configured to ensure the quality of the air source and extend the service life of the pneumatic components.
3. The gas pipeline generally adopts galvanized pipe. The pipe diameter shall be determined according to the flow rate, velocity and pressure loss of the gas source. D25 pipe shall be used for the main pipe and D20 pipe shall be used for the branch pipe.
The 4. must be equipped with sufficient test machine profiles, hardware fittings, sealing strips and wool strips (two for flat opening and two for push-pull)
Necessary work and apparatus for 5.
Serial Number |
Name |
Specifications |
Unit |
Quantity |
Remarks |
1 |
Box ruler |
3m |
Put |
2 |
|
2 |
Steel ruler |
500mm |
Support |
1 |
|
3 |
Rightedge |
300mm |
Put |
2 |
|
4 |
Fitter tools |
|
Sleeve |
1 |
|
5 |
Electrical Tools |
|
Sleeve |
1 |
|
6 |
Bench drill |
-12mm |
Taiwan |
1 |
|
After-sales service
(After the equipment is installed, it is carried out at the user's place)
The course includes the following:
Number of participants: about three to four
Object: Programmer, Machine Operator
Requirements: Windows operating system, technical drawings, especially CAD drawings
Course duration: approximately 3 days, with the modules to be delivered
Class location: at the user
Purpose: Use the software
1. Use of programming software
2. Data processing software docking